Skip to main content

The main power supply over in the florescent lit basement where the digital urban servers sit is being shutdown over the weekend for testing.

As such the blog will be missing images here and there so please accept our apologies for the shoddy nature of the posts over the next 48 hours.

Once all the safety boxes are ticked we should be back up and running in time for a new week…

The main power supply over in the florescent lit basement where the digital urban servers sit is being shutdown over the weekend for testing.

As such the blog will be missing images here and there so please accept our apologies for the shoddy nature of the posts over the next 48 hours.

Once all the safety boxes are ticked we should be back up and running in time for a new week…

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Close Menu

About Salient

The Castle
Unit 345
2500 Castle Dr
Manhattan, NY

T: +216 (0)40 3629 4753
E: hello@themenectar.com